BOB: Business Objects Board
Not endorsed by or affiliated with SAP

Register | Login 

 
Realtime CMS Reporting from Infolytik (Opens a new window)  

General Notice: No events within the next 45 days.

id: SDK - invalid prompt identifier (Error: RWI 00011)


 
Search this topic... | Search XI Scheduler... | Search Box
Register or Login to Post    Forum Index -> Enterprise Scheduling and Distribution -> XI Scheduler  Previous TopicPrint TopicNext Topic
Author Message
Abbi_man
Forum Member
Forum Member



Joined: 06 Feb 2012

Posts: 13


flag
PostPosted: Fri Apr 06, 2012 8:59 am 
Post subject: id: SDK - invalid prompt identifier (Error: RWI 00011)

Hello fellow Bob Gurus:

Iím in desperate need of advice to the issue below
We have couple of hundreds of reports that have multiple hundreds of instances created by uses. After removing one of the universe level prompt that these reports use we are getting the following error.
In this incident the prompt that was being used in the report at the time the recurrence was set is now completely removed. However, the recurrence still shows the previous entries in the prompts option that was removed from the universe.

"id: SDK - invalid prompt identifier (Error: RWI 00011)".

=== DETAILS ===
- Only recurring schedules are impacted.
- The source reports had universe level date prompt earlier.
- The Universe is modified and the prompt is removed.
- When we check the properties of the recurring schedules they still
show the old prompt specified.
- The user has to manually go and modify the prompts and reset the
recurrence.
- After which it completes successfully.

My problem is that it is not feasibly possible for us to manually modify the recurring schedules as there are hundreds of them.

I was wondering if there is a possible workaround for me to try and reset/update these recurring schedules so they are updated.

Thanks,
Ablante

Environment Details
Product Version: BOXIR3.1
Service Pack: SP5
Application server: Tomcat 5.5
Server: Windows Server 2008 R2
Database: SQL Server 2005
Back to top
Display posts from previous:   
Register or Login to Post    Forum Index -> Enterprise Scheduling and Distribution -> XI Scheduler  Previous TopicPrint TopicNext Topic
Page 1 of 1 All times are GMT - 5 Hours
 
Jump to:  

Index | About | FAQ | RAG | Privacy | Search |  Register |  Login 

Get community updates via Twitter:

Not endorsed by or affiliated with SAP
Powered by phpBB © phpBB Group
Generated in 0.0092 seconds using 17 queries. (SQL 0.0022 Parse 0.0002 Other 0.0069)
CCBot/2.0 (http://commoncrawl.org/faq/)
Hosted by ForumTopics.com | Terms of Service
phpBB Customizations by the phpBBDoctor.com
Shameless plug for MomentsOfLight.com Moments of Light Logo